Loading...
010625 Council Mtg Discussion Items with Attachments DISCUSSION ITEMS FOR JANUARY 6, 2025 CITY COUNCIL MEETING The documentation provided herewith consists of advance draft materials for review by Mayor and City Council. Such documents may be revised prior to the actual Council meeting before any formal consideration of same by Mayor and City Council. Said documents may also be revised by way of a proper amendment made at the Council meeting. These documents are informational only and not intended to represent the final decision of the Council. Page 1 of 1 Administration Department Interoffice Memorandum TO: Mayor and City Council FROM: Jim Clifford, City Administrator DATE: January 3, 2025 SUBJECT: Regular City Council Meeting of January 6, 2025 REGULAR COUNCIL MEETING NEW BUSINESS ITEM 5. PLANNING & DEVELOPMENT: Ordinance No. 2025-01 To Change the Corporate Limits of the City of North Augusta by Accepting the Petition Requesting Annexation by the Landowners and Annexing ± 0.70 Acres of Property Located at Edgefield Road/Saint James Street Tax Parcel Number 012- 05-14-004 Owned by Adams Brothers Properties, LLC – First Reading An ordinance has been prepared for Council’s consideration to approve To Change the Corporate Limits of the City of North Augusta by Accepting the Petition Requesting Annexation by the Landowners and Annexing ± 0.70 Acres of Property Located at Edgefield Road/Saint James Street Tax Parcel Number 012- 05-14-004 Owned by Adams Brothers Properties, LLC. Please see ATTACHMENT #6 for a copy of the proposed ordinance. ITEM 6. LAW & JUSTICE: 2025 Jury Box – Motion to Accept The 2025 Municipal Jury Box containing the names of all registered voters and the names of the individuals with the South Carolina driver’s license in our jurisdiction will be presented to Mayor and the City Council at tonight’s meeting for approval as is required by State law. ITEM 7. ENGINEERING: Resolution No. 2025-01 Authorizing the City of North Augusta to Enter into a Contract with Brasfield & Gorrie, LLC to Perform SRP Park – Wow! Terrace Repair Work A resolution has been prepared for Council’s consideration to approve Authorizing the City of North Augusta to Enter into a Contract with Brasfield & Gorrie, LLC to Perform SRP Park – Wow! Terrace Repair Work. Please see ATTACHMENT #7 for a copy of the proposed resolution. ORDINANCE NO. 2025-01 TO CHANGE THE CORPORATE LIMITS OF THE CITY OF NORTH AUGUSTA BY ACCEPTING THE PETITION REQUESTING ANNEXATION BY THE LANDOWNERS AND ANNEXING ± 0.70 ACRES OF PROPERTY LOCATED AT EDGEFIELD ROAD/SAINT JAMES STREET TAX PARCEL NUMBER 012-05-14-004 OWNED BY ADAMS BROTHERS PROPERTIES, LLC WHEREAS, Section 5-3-150(3) of the Code of Laws of the State of South Carolina provides that: "Notwithstanding the provisions of subsections (1) and (2) of this section, any area or property which is contiguous to a municipality may be annexed to the municipality by filing with the municipal governing body a petition signed by all persons owning real estate in the area requesting annexation. Upon the agreement of the governing body to accept the petition and annex the area, and the enactment of an ordinance declaring the area annexed to the municipality, the annexation is complete"; and WHEREAS, the Mayor and City Council of the City of North Augusta, have reviewed the petition of the landowners requesting that their property be annexed into the City and determined that such Petition should be accepted and the property annexed into the City; and WHEREAS, the property is situated within the area of the North Augusta 2021 Comprehensive Plan and recommended for Residential Single Family by that plan as specified in the Land Use Element; and WHEREAS, the annexation request and zoning classification has been reviewed by the Planning Commission which has recommended annexation of the property with + 0.70 acres to be zoned R-7, Small Lot Single Family Residential. NOW, THEREFORE, BE IT ORDAINED by the Mayor and City Council of the City of North Augusta, South Carolina, in meeting duly assembled and by the authority thereof that: I. The Petition of the landowners is accepted and the following described property shall be annexed into the City of North Augusta: ALL that certain piece, parcel or tract of land, with all improvements thereon, situate, lying and being in the County of Aiken, State of South Carolina, consisting of Seventy Hundredths (0.70) of an acre, more or less, appearing on that plat prepared for Anthony P. and Carol D. Riley by William H. McKie, III P.L.S. dated October 29, 2021 and recorded in the RMC Office of Aiken County in Plat Book 63 at Page 566. Said plat is incorporated herein by reference thereto. ATTACHMENT #5 Page 1 of 3 This parcel is identified as being on St. James Street by Tax Parcel Number 012- 05-14-004. The ±0.70 acres is requested to be zoned R-7 Small Lot Single-Family Residential. The property to be annexed is also shown on a map identified as “Exhibit A” titled “Map of Property Sought to be Annexed to the City of North Augusta” and prepared by the City of North Augusta. II. The zoning classification shall be +0.70 acres as R-7, Small Lot Single-Family Residential. III. All Ordinances or parts of Ordinances in conflict herewith are, to the extent of such conflict, hereby repealed. IV. This Ordinance shall become effective immediately upon its adoption on second and final reading. DONE, RATIFIED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS ______ DAY OF FEBRUARY, 2025. First Reading Briton Williams, Mayor Second Reading ATTEST: Jamie Paul, City Clerk ATTACHMENT #5 Page 2 of 3 05010015020025 Feet 12/4/2024 Path: H:\kbaker\ArcGIS\Annexations\ANX24-007 St James St Townhouses\ANX24-007 St James St Townhouses.aprx PROJECT NUMBER ANX24-007 MAP OF PROPERTY SOUGHT TO BE ANNEXED TO THE CITY OF NORTH AUGUSTA ± EDG E F I E L D C A R M E L BELVEDERE CLEAR WATER BELVEDERE CLEARWATER EVEL Y N ST JAM E S LA R R Y D E E P INEV I EW KERREDG E F I E L D JEF F HASKELL WI L D E S A N D M ELIZ A B E T H DO RR ROS E M A R Y FRA N C E S JESSEDEE EXHIBIT A Outside CityInside City TPN 012-05-14-004 Approximately 0.70 acres ATTACHMENT #5 Page 3 of 3 Department of Planning and Development Project Staff Report ANX24-007 St. James St. Townhouses Prepared by: Kuleigh Baker Meeting Date: December 18, 2024 Page 1 of 4 SECTION 1: ANNEXATION REQUEST SUMMARY Address/Location Corner of St. James St. and Edgefield Rd. Parcel Number 012-05-14-004 Total Development Size ± 0.70 ac Zoning Requested R-7, Single Family Small Lot Residential Future Land Use Residential Single Family SECTION 2: PLANNING COMMISSION CONSIDERATION Adams Brothers Properties, LLC has requested to annex parcel number 012-05-14-004, approximately 0.70 acres, located at the corner of Edgefield Rd. and St. James St. The request is for the parcels to be zoned R-7, Single Family Small Lot Residential at the time of annexation. NADC Additional Reviews 4.7 Annexation – All territory which may hereafter be granted or annexed to the City of North Augusta shall be classified automatically in the R-14 District, except that at the time the application for annexation is filed the applicant may request a zoning classification that is similar to surrounding zoning and in accord with the city’s Comprehensive Plan. Proposed annexations where the requested zoning is inconsistent with the Land Use Element of the Comprehensive Plan or differs from zoning on adjacent properties shall be reviewed by the Planning Commission in accordance with Article 18, Administration and Enforcement. The Planning Commission shall recommend to the City Council the appropriate zoning for the property to be annexed, modification to the Land Use Element of the Comprehensive Plan, or both. The Planning Commission is being asked to make a recommendation regarding the zoning classification of this property prior to annexation. The subject parcel Future Land Use is Residential Single Family. ATTACHMENT #5 - P&D INFORMATION Page 1 of 9 Project Staff Report ANX24-007 St. James St. Townhouses Prepared by: Kuleigh Baker Meeting Date: December 18, 2024 Page 2 of 4 SECTION 3: EXISTING SITE CONDITIONS Existing Land Use Future Land Use Zoning Subject Parcel Vacant Residential Single Family UD, Urban Development (Aiken County North Commercial Mixed Use UD, Urban Development (Aiken County South Commercial Mixed Use UD, Urban Development (Aiken County)/GC, General Commercial/P, Public Use East Vacant/Residential Residential Single Family UD, Urban Development (Aiken County West Residential and Commercial Mixed Use UD, Urban Development (Aiken County SECTION 4: STAFF EVALUATION AND ANALYSIS The parcel proposed for annexation currently is vacant. It was previously cleared. Road access is available from St. James St. The property is surrounded by small businesses and residences. The applicant has requested the R-7, Single Family Small Lot Residential zoning district at the time of annexation. The Planning Commission is being asked to make a recommendation regarding the compatibility of the zoning classification of this property prior to annexation. The R-7, Single Family Small Lot Residential zoning district is described as the following: 4.12.3 R-7, Small Lot Single-Family Residential District – The purpose of this district is to provide for a variety of single-family housing types on small lots to meet market demands for smaller lot developments. It is also the intent of this district to balance higher densities with common open space. The following uses are allowed in an R-7 zoning district per NADC 5.1 Use Matrix: Primary Uses • Accessory Dwelling • Bus Shelter • Storage of Construction Equipment, Outdoor, Incidental to Construction Activities ATTACHMENT #5 - P&D INFORMATION Page 2 of 9 Project Staff Report ANX24-007 St. James St. Townhouses Prepared by: Kuleigh Baker Meeting Date: December 18, 2024 Page 3 of 4 • Duplex • Single-Family Attached Dwelling • Single-Family Detached Dwelling • Tourist Home • Place of Assembly, Small • Swimming Pool • Cemetery • Primary or Secondary School • Essential Public Services Accessory Uses • Studio for Creative or Expressive Art • Parking, Structured • Parking, Surface Conditional Uses • Child/Adult Care Home • Farmers and Produce Markets • Food Trucks • Home Occupation • Real Estate Sales and Construction Offices and Equipment Sheds • Group Homes, Non-Exempt • Marina • Telecommunications, Small Cell Special Exception Uses: • Home Occupation • Bed and Breakfast • Private Non-profit Clubs and Organizations • Energy Generation, Small Scale • Telecommunication Tower and Antennae • Agriculture, Excluding Livestock Section 6.2 of the Comprehensive Plan promotes providing a more varied housing stock to attract and retain a more diverse population, especially in downtown and near employment centers. Section 6.2.2 of the Comprehensive Plan encourages revising the zoning ordinance and map to incentivize a variety of housing types at higher densities. This is further supported by Section 4.2.4 to support the priorities and principles of the Aiken, Edgefield, and Saluda Counties ATTACHMENT #5 - P&D INFORMATION Page 3 of 9 Project Staff Report ANX24-007 St. James St. Townhouses Prepared by: Kuleigh Baker Meeting Date: December 18, 2024 Page 4 of 4 Economic Development Partnership by providing housing in an area that is expanding with new industries. Based on these descriptions and similarly zoned properties within the city limits, staff believes allowing R-7, Small Lot, Single Family Residential zoning is appropriate for the property. SECTION 5: ATTACHMENTS Exhibit A Map Exhibit B Map Application Documents cc Adams Brothers Properties, LLC, via email GT Builders, LLC, via email ATTACHMENT #5 - P&D INFORMATION Page 4 of 9 05010015020025 Feet 12/4/2024 Path: H:\kbaker\ArcGIS\Annexations\ANX24-007 St James St Townhouses\ANX24-007 St James St Townhouses.aprx PROJECT NUMBER ANX24-007 MAP OF PROPERTY SOUGHT TO BE ANNEXED TO THE CITY OF NORTH AUGUSTA ± EDG E F I E L D C A R M E L BELVEDERE CLEAR WATER BELVEDERE CLEARWATER EVEL Y N ST JAM E S LA R R Y D E E P INEV I EW KERREDG E F I E L D JEF F HASKELL WI L D E S A N D M ELIZ A B E T H DO RR ROS E M A R Y FRA N C E S JESSEDEE EXHIBIT A Outside CityInside City TPN 012-05-14-004 Approximately 0.70 acres ATTACHMENT #5 - P&D INFORMATION Page 5 of 9 C A R M E L EDG E F I E L D EVEL Y N STJAMES LA R R Y D E E KERR EDG E F I E L D PINEVI E W SA N D M DO RR ROS E M A R Y JESSED EE GC P R-14 PROJECT NUMBER ANX24-007 ZONING OF PROPERTY SOUGHT TO BY ANNEXED TO THE CITY OF NORTH AUGUSTA 09018027036045 Feet 12/4/2024 ± Path: H:\kbaker\ArcGIS\Annexations\ANX24-007 St James St Townhouses\ANX24-007 St James St Townhouses.aprx EXHIBIT B Outside City Limits TPN 012-05-14-004 to be zoned R-7, Small Lot Single Family Residential Outside City Limits ATTACHMENT #5 - P&D INFORMATION Page 6 of 9 Planning and Development Application Please type or print all information North� Augustq___�j-/ south Carolina's Riverfront Application Number t:i"1:t:--�'\ -DD 7 ReviewFee - Staff Use Date Received l \ -V"1 -:t. '::f Date Paid --- ,-... 1.Project Name _$--.,;.-\ ..... __.� .... a ......... Y!1<�P--..5-----"""'\. ..... ;:-=-=4f.......,,.""'J_J),........,o--...\.s.._S...-....a:9-,..____$ _____________ _ Project Address/Location St. James St Total Project Acreage _0....... 3 ........ S .... 4------- Tax Parcel Number(s) 012-05-14-004 Current Zoning 2.Applicant/Owner Name Bel� llot,S h 1-o#e-,,, s: Applicant Phone e 03-5& '?-8 3 8 3 Mailing Address '39 /+-J hgre:... l, k s s-O,,. · IL G T /3, •J 5-.n-�1,"o • ._City f:1¼, j"'f sfi ST � Zip ,3o 4/o I Email a.,:!:4-.,ct>:Sl1 � ::c:t>., 3.Is there a Designated Agent for this project? ___ Yes V No If Yes, attach a notarized Designation of Agent form. (required if Applicant is not property owner) 4.Engineer/Architect/Surveyor -�---�---1/l.Jt�_J:_A�V=-____ _ License No.CoJ2.JJ/Zo 6g67 Firm Name 1/171: PE$'"/f,,/ 4 £()tJe Firm Phone �:J rZU-7' 72 Firm Mailing Address I� 2/ Ct.>A-7;1,r />4, City &i1w /Jv4 uS-rA ST 5'C Zip 2 ,�/// Signature ______________ _ Date II-t,-2'1 5.Is there any recorded restricted covenant or other private agreement that is contrary to, conflicts with or prohibits the use or activity on the property that is the subject of the application? (Check one.) ___ yes V no 6.In accordance with Article 18 of the North Augusta Development Code, I hereby request the City ofNorth Augusta review the attached project plans. The documents required by the City of NorthAugusta, as outlined in Appendix B of the North Augusta Development Code, are attached for the City's review for completeness. The applicant acknowledges that all required documents must be correct andlete to initiate the compliance review process. 7.�App icant or Designated Agent Signature � o'"4 AJiA.�� Print Applicant or Agent Name LL-6 -2J../Date 512024 ATTACHMENT #5 - P&D INFORMATION Page 7 of 9 ATTACHMENT #5 - P&D INFORMATION Page 8 of 9 ATTACHMENT #5 - P&D INFORMATION Page 9 of 9 RESOLUTION NO. 2025-01 AUTHORIZING THE CITY OF NORTH AUGUSTA TO ENTER INTO A CONTRACT WITH BRASFIELD & GORRIE, LLC TO PERFORM SRP PARK – WOW! TERRACE REPAIR WORK WHEREAS, Resolution No. 2024-37 authorized an agreement with Williamson & Associates (W&A), a building exterior weatherproofing consultant, to perform leak testing and consulting services at SRP Park; and WHEREAS, in accordance with this agreement, W&A provided a Summary of Work Outline, dated November 19, 2024, including repair drawings and details; and WHEREAS, Brasfield & Gorrie, LLC has provided a construction cost estimate to perform the recommended repairs for $252,776.00. NOW THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of North Augusta, South Carolina, in a meeting duly assembled and by the authority thereof, that Brasfield & Gorrie, LLC shall be awarded a contract for SRP Park – WOW! Terrace Repair Work, in accordance with its proposal dated December 23, 2024. BE IT FURTHER RESOLVED that the funding source for this contract, plus contingencies, shall be from the Riverfront/Central Core Redevelopment Fund in an amount not to exceed $280,000.00. BE IT FURTHER RESOLVED that the City Administrator is authorized to execute such documents as necessary to enter into this contract. DONE, RATIFIED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS ______ DAY OF JANUARY, 2025. Briton S. Williams, Mayor ATTEST: Jamie Paul, City Clerk ATTACHMENT #7 Page 1 of 1 ATTACHMENT #7 - Agreement Information Page 1 of 34 ATTACHMENT #7 - Agreement Information Page 2 of 34 ATTACHMENT #7 - Agreement Information Page 3 of 34 ATTACHMENT #7 - Agreement Information Page 4 of 34 ATTACHMENT #7 - Agreement Information Page 5 of 34 ATTACHMENT #7 - Agreement Information Page 6 of 34 ATTACHMENT #7 - Agreement Information Page 7 of 34 ATTACHMENT #7 - Agreement Information Page 8 of 34 ATTACHMENT #7 - Agreement Information Page 9 of 34 Andrew Hannah, Division Manager ATTACHMENT #7 - Agreement Information Page 10 of 34 EXHIBIT A Item of Work Total Cost Unit Cost 0295 Site Requirments(Dumpsters, temp protection, temp fencing, expendables, final cleaning)$30,000 - 0300 Concrete Demo and Repour $42,930 - 0400 Masonry (Demo and Install)$63,812 - 0700 Waterproofing and TPO_Coping $56,300 - 0810 Door, Frames & Hardware Interior (Allowance)$1,000 - 0900 Drywall (Demo, framing and Sheathing work)$37,012 - 0910 Painting (Interior Allowance for wall/ceiling repairs)$12,000 - 6501 - Contractor OH-Project Management - - 6502 - Contractor OH-Field Supervision - - 6503 - Contractor OH-Support Staff - - 6504 - Contractor OH-General Requirements - - Contractor Insur & Risk Mgmt $3,160 - Builders Risk Insurance $3,160 - Subcontract Default Protection $3,403 - Contingency (5%) - - Subtotal $252,776 - Fee - - Totals $252,776 - SCHEDULE OF VALUES | SRP Park SRP Park - WOW! Terrace Waterproofing Repairs North Augusta, SC 12/23/2024 ATTACHMENT #7 - Agreement Information Page 11 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 1 12/13/2024 SRP Park Remediation EXHIBIT B WOW Terrace List of Clarifications and Pricing Assumptions 100 GENERAL CLARIFICATIONS 1. We have based our Pricing and Schedule on: a. Wow! Club Terrace Leakage Repairs Drawings dated 11/15/24, as prepared by Williamson & Associates. b. Summary of work outline SRP Park – Augusta Green Jackets Stadium Leakage Repairs to “WOW” Club Terrace dated 1/19/24, as prepared by Williamson & Associates 2. The below Lists of Clarifications, Inclusions, and Exclusions supersede all plans and specs emailed and other written or verbal directions as pertaining to this scope of work. 3. The Contract Sum for this work is $252,776 as detailed in Exhibit A, Schedule of Values. Final contract sum for this work to be based on subcontractor costs submitted to Brasfield & Gorrie (B&G). B&G will send a request to the City of North Augusta for approval prior to execution of work beyond base contract sum. 4. Pricing is valid through 01/06/25, and is contingent upon approval of the complete scope of work. Pricing breakouts provided on the bid form are for information only and assume the entire project will be awarded to Brasfield & Gorrie as a lump sum contract. All pricing is based on Williamson & Associates Drawings and Summary. Schedule is Exhibit C and dependent on finalized Start Date once contract is executed. Date of commencement shall be the following Monday from the Signed Contract Date, but not less than 1 week from Signed Contract Date. Date of Substantial Completion shall be dependent on the work required once Demolition is completed and reviewed by W&A. 5. Pricing is strictly based on the schedule durations as summarized in Exhibit C – WOW Club Terrace Schedule. Changes to the dates or durations indicated in this schedule due to impacts outside of Brasfield & Gorrie’s control will result in a possible contract adjustment of cost and time. 6. Project schedule and delivery based on uninterrupted access to WOW Club Terrace and access to it along with Tenant Space below the terrace during construction. Our proposal assumes no interruptions to production or schedule and no special security requirements to complete scope of work. Work notification process has not been provided. 7. Pricing assumes no Commissioning of existing equipment. 8. The Warranty for this work is limited to the waterproofing repair work being performed in accordance with the Williamson and Associates Drawings and Summary and shall be limited to One (1) year from the date of substantial completion. The City of North Augusta must notify the Contractor within 7 days of any leaks to maintain warranty. 9. Any warranty work performed must be completed with Williamson and Associates on site to assure all work conforms to their recommendations. Cost of Work will be billed to City at in accordance with this contract. ATTACHMENT #7 - Agreement Information Page 12 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 2 10. It is understood that additional scope may be added after demolition work is completed by W&A. This scope will be reviewed and evaluated for costs and time once issued and added through a Change Order to the base contract sum. Inclusions 1. All clarifications are intended to reference base bid pricing a. Brasfield & Gorrie does not plan to perform any task with its own crews. 2. It is required that all subcontractors and vendors working directly for the owner and/or architect shall adhere to and follow Brasfield & Gorrie safety guidelines while on the project site. It will also be required that some of the vendors/subcontractors attend schedule and progress meetings as necessary 3. All work is proposed to proceed during normal work hours 4. All unscaled drawings were assumed to be consistent with the scale of Original drawings. 5. We have assumed that we will be able to secure the building after final cleaning of areas. The final security design has not been provided at the time of this pricing. If temporary measures are required to secure the building (i.e. temporary door hardware and/or basic access control) this will require additional costs. 6. Sales Tax included within sub quotes 7. Dumpsters and Equipment as needed for scope of warranty work 8. An Allowance of $12,000.00 has been carried for interior work within Tenant space below WOW Club terrace. 9. Use of existing Elevators to the terrace level for construction activities. 10. An Allowance of $30,000.00 has been carried for Dumpsters, temporary protection, temporary fencing, expendables, and final cleaning. Exclusions 1. Brasfield & Gorrie has not included any contingency for this work. We Suggest Carrying 5% on top for any changes required by Williamson & Associates during the progress of the work 2. These clarifications exclude work with other buildings on the SRP Park Campus 3. Building Permit cost. 4. Construction Materials Testing or Special Inspections cost. 5. Architectural, Civil and Structural Design Fees. 6. Cost for code required inspections (rebar, etc.). 7. Demo/Removal/Replacement/Relocation of any utilities. 8. Network power feeds to jobsite. 9. Telephone and CATV service 10. Payment and Performance Bond. 11. Cameras or other video monitoring devices and services to show construction progress. 12. All Power bills. 13. Utility/telephone company charges. 14. Delays due to revised drawings/details in required work. 15. Provisions for any site security requirements (roaming guards or additional security equipment). 16. Design or engineering of any structural components. 17. Builders Risk Insurance on Existing Equipment 18. B&G Excludes all performance responsibility for existing Equipment. ATTACHMENT #7 - Agreement Information Page 13 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 3 19. Modification of previously installed work unless specifically identified as part of the contract documents. 20. Any acceptance requirements for completion of the scope of work outside of those expressly included in the contract documents previously referenced. 21. Temporary security personnel. Assumed to be provided by others if required. 22. Cost for moving owner furnished materials or items placed in the building. If needed, we will track on time & material to be reimbursed. 23. Cost for temporary measures around phased turnovers (barricades) 24. This proposal excludes any responsibility for the identification, removal, or remediation of mold. Should mold be discovered, B&G will notify the Owner immediately to determine the appropriate course of action. Any work related to mold remediation will be considered a change order and will be subject to additional costs and time extensions as agreed upon by both parties 300 CONCRETE Inclusions 1. Saw cut, Demo, Removal per W&A drawings 2. 4” 4000psi normal weight concrete and wwm W1.4 for replacement topping slab 3. Drill and Dowel into existing topping slab 4. Concrete pumping and equipment. 5. Brush finishing of concrete Exclusions 1. Any Structural assessments of existing structure. Assumed existing structure can handle all new work 2. Decorative concrete finishing 3. Slick finishing 4. Cleaning of existing concrete outside of warranty scope of work 400 MASONRY Inclusions 1. Means of access/material movement via 6k Forklift from the South and West sides of the Terrace, to remove existing brick material and load new brick material. 2. Thru Wall flashing System includes: Flexible flashing, stainless steel termination bar, SS Screws, sealant, Stainless steel drip edge, Quatro Vent weeps, and Mortar net 3. Brick Veneer priced to be Palmetto Whitestone (Modular) Exclusions 1. Any Structural assessments of existing structure. Assumed existing structure can handle all new work 2. Tie-ins or alterations to existing building areas other than what is explicitly shown within the drawings and ATTACHMENT #7 - Agreement Information Page 14 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 4 specifications provided by Williamson & Associates 3. Cleaning of existing masonry 4. New Brick shelf angle. Existing to be used 500 STEEL Inclusions 1. None Exclusions 1. None 2. Excludes any and all structural or misc steel other than brick shelf angle 3. New Guardrails 700 WATERPROOFING & ROOFING Inclusions 1 All Roof patching for modifications of Screen Wall and Concrete ramp 2 New TPO to run up back side of screen wall per drawings. 3 Add Mechanical terminations as needed. 4 Exclusions 1. None 800 GLASS & GLAZING Inclusions 1 None Exclusions 1. None 810 DOORS/FRAMES/HARDWARE ATTACHMENT #7 - Agreement Information Page 15 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 5 Inclusions 1. 1ea threshold for terrace door – Inverge ‘Silguard’ Exclusions 1. Furnish and install of any new doors and frames 830 OH Doors Inclusions 1. None Exclusions 1. Furnish and Install of any new OH door or supports 900 DRYWALL/FRAMING Inclusions 1. Drywall demo and replacement of Interior area of Tenant space below WOW Club Terrace, only where current drywall/paint is damaged due to leak within the allotted allowance value. a. Wire brushing of rusted steel in visible areas where drywall is removed. 2. Removal of Hardie Siding on Screen wall and section of wall at Storefront door 3. Cutting back of shelf angle per W&A Details 4. Installing new bypass framing for a continuous wall assembly from top of screen wall to lower slab 5. Reframe of structural stud framing for ramp Exclusions 1. Drywall patching at any other locations throughout building 2. Decking for the stud framed ramp 3. Replacement if siding in 910 PAINT Inclusions 1. Repainting of Interior area of Tenant space below WOW Club Terrace, only where current drywall/paint is damaged due to leak within the allotted allowance value. ATTACHMENT #7 - Agreement Information Page 16 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 6 Exclusions 1. Any work inside of tenant space outside of extents of damaged area due to leak above. 2. Any additional work over and beyond what is covered in the allowance. If additional scope is needed over and beyond the allowance value, this will be subject to additional costs and time extension. 930 FLOORING Inclusions 1. None Exclusions 1. Moisture mitigation of existing slabs 2. Sealed concrete 3. Any and all flooring within tenant spaces. This includes but not limited to demo, removal, replacement, furnish, or installation of all flooring types. If any scope is needed, this will be subject to additional costs and time extension. 1000 SPECIALTIES & WALL PROTECTION Exclusions 1. Any and All new Specialties. If any Specilty work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1010 SIGNAGE Exclusions 1. Any and All Signage. If any Signage work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1200 FURNISHINGS Exclusions 1. Any and all new furnishings on WOW club terrace or inside tenant spaces below including but not limited to a. Window shades / treatments – none shown b. Furniture c. Rugs d. Lights 1500 HVAC ATTACHMENT #7 - Agreement Information Page 17 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 7 Inclusions 1. None Exclusions 1. Any and All HVAC work. If any HVAC work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1530 FIRE PROTECTION Inclusions 1. None Exclusions 1. Any and All Fire Protection. If any Fire Protection work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1600 ELECTRICAL Inclusions 1. None Exclusions 1. Any and All Electrical work. If any Electrical work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1620 SECURITY Exclusions 1. Any and All Security Provisions. If any Security work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 1700 STRUCTURED CABLING Inclusions ATTACHMENT #7 - Agreement Information Page 18 of 34 SRP Park Warranty Construction Document Pricing – WOW Terrace List of Clarifications and Pricing Assumptions 8 1. None Exclusions 1. Any and All Structured Cabling. If any Structured Cabling work is required after demolition, this work will be subject to a Change Order for additional costs and time extension. 9000 INSURANCE and PERMITS Inclusions 1. Construction insurance and risk management at a rate of 1.3% 2. Builder’s Risk insurance at a rate of 1.3% 3. Sub default protection insurance at a rate of 1.4% Exclusions 2. Building Permit 3. Payment & Performance Bonds ATTACHMENT #7 - Agreement Information Page 19 of 34 Activity ID Activity Name Rem Dur Start Finish SRP Park Water Leak RepairsSRP Park Water Leak Repairs 66 20-Nov-24 05-Mar-25 AdministrativeAdministrative 43 06-Jan-25 05-Mar-25 A1170 Construction Start 0 06-Jan-25 A1180 Construction Complete 0 05-Mar-25 PreconstructionPreconstruction 16 20-Nov-24 13-Dec-24 A1000 Receive Details / Plans 1 20-Nov-24 20-Nov-24 A1010 Pricing / Coordination with Subs 10 21-Nov-24 06-Dec-24 A1020 Contract and SOV Approval with City 5 09-Dec-24 13-Dec-24 ConstructionConstruction 43 06-Jan-25 05-Mar-25 A1030 Mobilze / Set Up Fencing 2 06-Jan-25*07-Jan-25 A1140 Demo Brick and Siding 10 08-Jan-25 21-Jan-25 A1040 Demo Concrete 3 16-Jan-25 20-Jan-25 A1050 Demo Existing Waterproofing 2 21-Jan-25 22-Jan-25 A1060 Inspections and Revised W&A Details 5 22-Jan-25 28-Jan-25 A1070 Re-Install Waterproofing and TPO 5 29-Jan-25 04-Feb-25 A1100 Demo Interior Walls and Ceilings 5 05-Feb-25 11-Feb-25 A1190 Flood Testing 2 05-Feb-25 06-Feb-25 A1160 Pour Back Concrete Terrace 5 07-Feb-25 13-Feb-25 A1110 Build / Repair Interior Walls and Ceilings 5 12-Feb-25 18-Feb-25 A1080 Replace Brick 10 14-Feb-25 27-Feb-25 A1120 Paint New Walls and Ceilings 3 19-Feb-25 21-Feb-25 A1130 Final Cleaning 3 24-Feb-25 26-Feb-25 A1090 Install New Coping 2 28-Feb-25 03-Mar-25 A1150 Demobilize form Site 2 04-Mar-25 05-Mar-25 Nov Dec Jan Feb Mar Apr May Jun 2024 2025 Construction Start Construction Complete Receive Details / Plans Pricing / Coordination with Subs Contract and SOV Approval with City Mobilze / Set Up Fencing Demo Brick and Siding Demo Concrete Demo Existing Waterproofing Inspections and Revised W&A Details Re-Install Waterproofing and TPO Demo Interior Walls and Ceilings Flood Testing Pour Back Concrete Terrace Build / Repair Interior Walls and Ceilings Replace Brick Paint New Walls and Ceilings Final Cleaning Install New Coping Demobilize form Site SRP Park Water Leak Repairs Overall Project Schedule - 20-Nov-24 Page: 1 of 1 File: SRPPWLR-0 EXHIBIT C ATTACHMENT #7 - Agreement Information Page 20 of 34 ALLOWANCE LOG EXHIBIT D SRP Park - WOW! Terrace Waterproofing Repairs Description Qty Unit Unit Cost Total Cost Notes LVL 2 & 3 1 Interior finish work allowance 1 EA $15,000.00 15,000$ 2 Misc General Condition Items (i.e. Dumpsters, fencing, protection, equipment expendables, etc)1 EA $30,000.00 30,000$ 3 Door threshold/hardware 1 EA $1,000.00 1,000$ -$ -$ -$ *** All allowances are inclusive of matl., labor, taxes, & subcontractor markup unless otherwise indicated *** Contractor Fee not included in line items above 46,000$ City of North Augusta December 13, 2024 ATTACHMENT #7 - Agreement Information Page 21 of 34 ATTACHMENT #7 - Agreement Information Page 22 of 34 727-1 Industrial Park Dr. Evans, Ga. 30809 706-922-6808 PROPOSAL SUBMITTED TO: PHONE: DATE: December 5, 2024 Brassfield and Gorrie STREET: JOB NAME: SRP Park Terrace CITY, STATE AND ZIP CODE: JOB LOCATION: Augusta SRP Park Terrace Demo Total: $27,590.00 • Saw cut and demo 4” topping slab • Remove insulation and drainage mat under slab • Haul off and dispose of demo material New Topping Slab Total: $15,340.00 • 4” concrete, 4000psi normal weight concrete and wwm W1.4 • Drill and dowel into existing topping slab • Concrete pumping and equipment Notes: Elevator to be used as access for removal of demo material. Waterproofing and insulation repair by others. Decorative concrete finishing is not included. WE PROPOSE hereby to furnish material and labor – complete in accordance with above specifications, for the sum of: As Noted Above Payment to be made as follows: Progress Payments Authorized Signature: William W. Jones, Jr. Date of Acceptance: ____________________________________________ Signature: ______________________________________ ATTACHMENT #7 - Agreement Information Page 23 of 34 Serving the Southeast Since 1959 116 LOCUST STREET ⚫ AVONDALE ESTATES, GEORGIA 30002 ⚫ 404.294.5393 ⚫ FAX: 404.297.8326 ⚫ www.jollaymasonry.com Date 12/5/2024 Architect Odell Client Brasfield & Gorrie Drawing Date 2/23/2017 Project Green Jacket Stadium- WOW Terrace Base Bid Amount $63,812 Review of Scope Provided: Item Number Approximate Quantity Scope of Work Cost Impact 532 SF Demo existing brick veneer at South (Terrace) side of the South-Facing Screen Wall See base bid amount above. 532 SF Install below grade brick, XPS Insulation, Thru Wall Flashing System at BOW, and cell weeps above WPFG and flashing system. Replace new brick veneer at South (Terrace) side of the South-Facing Screen Wall See base bid amount above. 120 SF Demo existing brick veneer at West side of West-Facing Screen Wall, saw cutting at head joint for new vertical expansion joint. See base bid amount above. 120 SF Install XPS Insulation, Thru Wall Flashing System at BOW with cell weeps. Replace new brick veneer at West side of West-Facing Screen Wall See base bid amount above. 24 SF Demo existing brick veneer at Door Alcove (Inset) at South side of Screen Wall See base bid amount above. 24 SF Install XPS Insulation, Thru Wall Flashing System at BOW with cell weeps. Replace new brick veneer at Door Alcove (Inset) at South side of Screen Wall See base bid amount above. *Proposal Clarification: Brick Veneer priced to be Palmetto Whitestone (Modular) *Thru Wall Flashing System includes: Flexible flashing, Stainless Steel Termination Bar, SS Screws, Sealant, Stainless Steel Drip Edge, Quatro Vent Weeps, and Mortar Net. *Means of access/material movement via 6K Forklift from the South and West sides of the Terrace, to remove existing brick material and load new brick material. *Please reference each number on the drawing set for locations. Additive and deductive bid items: Item Number Item Detail Add Deduct Value 1. 2. 3. Bid Proposal Letter Please note that this proposal letter contains proprietary wording, format- ting, and items considered to be trade secrets to our company. Any cop- ying, redistribution, or derivative works without explicit written approval by a principal of the company is strictly prohibited. ATTACHMENT #7 - Agreement Information Page 24 of 34 X Exclusions: Item Number Specification Detail Item Detail Included Excluded 1. Existing Conditions 02_00_00 General Item No assessments or surveys have been included within this proposal. We ex- pect all information provided for pricing to come from plans and specifica- tions from the date listed above subject to the inclusions and exclusions pro- vided within this proposal. X 2. Existing Conditions 02_00_00 General Item All structural loads and capacities of the structure are expected to handle industry standard construction activities for material movement and instal- lation. No specialized methods for these processes have been included un- less noted otherwise. X 3. Existing Conditions 02_00_00 General Item No tie-ins or alterations to existing building areas have been included other than what is explicitly shown within the drawings and specifications from the date listed above. X 4. Existing Conditions 02_00_00 General Item We have not provided protection for locations where our scope of work does not occur or on elevations/work areas where we are not actively installing masonry product. We have assumed general roof protection is to be pro- vided by others. X 5. Channel/ L-beam installation X 6. Cleaning of existing masonry X 7. Caulking X 8. Dumpsters X Payment Terms Within 15 days upon inspection OR Upon contract period, an initial allowance of 10% of the total contract value is to be paid to account for mobilization costs. Once work be- gins, 3 subsequent payments are to be made based on percentage of scope completed. Pay- ment terms negotiable upon contract. Warranty Terms Material only. Standard 1 year install war- ranty. No weather tight warranty can be provided. Mobilization Two mobilizations included. Site Access Area will be given to Jollay Masonry, Inc. and pedestrian traffic will be coordinated around work location. Work is performed during normal working hours Monday through Friday. No night or weekend work has been priced. All material is guaranteed to be as specified. All work to be completed in a workman like manner according to standard industry practices. Any alteration or deviation from the above scope detail/specifications involving extra cost will be executed only upon written authorization and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents, or delays that may be beyond our control. All applicable taxes and insurance are included within our proposal. Unless noted above, no guarantees are made with this proposal to limit or prohibit water or moisture issues. Acceptance of Proposal Tyler Hall Project Manager Jollay Masonry, Inc. Printed Name: _______________________ Phone: 770-313-3876 Email: Thall@jollaymasonry.com Date: _______________________________ ATTACHMENT #7 - Agreement Information Page 25 of 34 UP H FS TS TS FS UPUPUP FE FE FE FE D D CW I CW OD CO 2 D DD D AIR AIR CO2 CD AIR I N AIR O U T EL E C . PA N E L E1 E 2 DD DE DHDH DJ A3 1 A3 0 A2 9 A2 8 A2 7 22 21 23 24 25 A2 6 A2 5 A2 4 20 20 19 A2 2 A2 1 DADB DF DG BD . 8 A2 0 A1 9 CA A1 AE 3 0 2 C1 AE 3 0 2 JA N I T O R 2B 0 7 FA M I L Y TO I L E T 2B 0 6 ME N ' S TO I L E T 2B 0 4 FR A N C H I S E 6 S H E L L 2B 3 0 WO M E N ' S TO I L E T 2B 1 1 FS P R E P . 2B 1 0 CO N C E S S I O N 2B 0 9 ST A I R 3 2B 1 2 EL E C T R I C A L ME T E R RO O M 2B 1 3 FR A N C H I S E 5 S H E L L 2B 2 0 RE T A I L 1 SH E L L 2B 4 0 RE T A I L 2 SH E L L 2B 5 0 S E AT I N GREMOVABLE M I N . 3 0 " M I N . 3 0 " BC BC AE 4 6 2 E1 ST A I R 2 2B 0 5 A6 AE 3 0 6 D5 AE 4 6 2 CO N C O U R S E EN T R Y CL U B 2A 0 1 AE 4 6 3 D2 AE 4 5 1 E1 AE 4 5 2 A2 AE 4 5 3 A3 D4 AE 3 0 5 B4 AE 3 0 5 A6 AE 3 0 5 AE 2 0 2 A4 A2 AE 3 0 6 B6 AE 3 0 5 2A 0 1 A 2B 0 7 A 2B 0 6 A 2B 2 0 B 2B 2 0 A 2B 3 0 B 2B 1 0 A 2B 1 1 A 2D 0 2 C A6 1A 6 WM 4 S 6 A6 A6 WM 4 M 8 WM 4 M 8 WM 4 S 6 AE 1 0 2 A AE 1 0 2 B AE 1 0 2 B AE 1 0 2 D AE 1 0 2 A AE 1 0 2 B AE 1 0 2 B AE 1 0 2 D 2B 4 0 A 2B 5 0 A 2B 1 2 A 2B 1 3 A TR A N S F O R M E R 2D 0 1 CO N C O U R S E 2B 0 8 2B 1 4 A EL E V A T O R CO N T R O L CL O S E T 2B 1 4 2B 2 0 C 2B 3 0 C 2B 0 9 A 2D 1 2 A AD SLOPE TO DRAIN TYP SLOPE TO DRAIN TYP SLO PE TO D RAIN TYP SLOPE TO DRAIN TYP 1 0 ' - 0 " T Y P . E Q UA L T Y P . E Q UA L 2B 0 4 A 8' - 2"15' - 4"15' - 4"17' - 4"23' - 0"7' - 8"15' - 4"27' - 5"8' - 10"21' - 7"3' - 6" 3' - 4"12' - 0"3' - 4"12' - 0"3' - 4"12' - 0"3' - 4" 18 ' - 6 " 8' - 6 1 /2 " 1 2' - 1 1 /2 " 2' - 7 1 / 2 " 19 ' - 1 0 1 / 2 " 42 ' - 0 " 9 ' - 0 1 /2 " 4" ST O R A G E 2B 1 5 AE 2 0 3 B6 D6 AE 3 0 5 WM 4 S 6 WM 4 S 6 WM 4 S 6 AD EQ.EQ. AD 3' - 7 " 20 ' - 0 " AD AD AD AD AD AD WM 4 S 6 WM 4 S 6 WM 4 S 6 DR - 1 DR - 1 DR - 1 BD AE 2 0 7 B6 AE 2 0 7 B2 AE 2 0 7 A5 2B 0 5 A 2B 1 5 A 2B 0 7 B 2B 0 4 B F- 1 F- 1 F- 1 AE 5 3 1 B4 AE 5 0 2 D2 TY P AE 5 0 2 D2 TY P AE 2 0 2 C5 2' - 8"12' - 4"26' - 4"13' - 4" WA T E R HE A T E R 37 2 AD E Q U AL E Q U AL W1 0 W7 W1 0 W1 0 W1 0 2D 0 1 A FG 3 FG 1 FG 2 R- 5 R- 5 R- 5 WP WP WP WM 4 M 8 C6 2B 3 0 A WM 4 S 6 WS 1 S 6 AE 5 0 2 A3 AE 5 0 2 B3 WM 4 S 6 WS 1 S 6 WS 1 S 6 WS 1 S 6 WS 1 S 6 WM 4 S 6 2' - 4 " 10 ' - 8 " 3' - 4 " 4' - 8 " 7' - 0 " 6' - 4 " +/ - 2 ' - 9 " EL E V A T O R VE S T I B U L E 2B 0 2 EL E V A T O R 2 2B 0 1 1A 6 1A 4 B2 AE 4 6 2 12 ' - 4 " 10 ' - 0 " 2' - 8 " SU I T E L E V E L A B O V E SU I T E L E V E L A B O V E SU I T E L E V E L A B O V E R- 1 R- 1 R- 1 CO N C R E T E S T E P SE E C I V I L A N D A 6 / S B 5 0 1 CO N C R E T E S T E P S SE E C I V I L A N D A 6 / S B 5 0 1 DC B6 AE 4 2 1 E2 AE 2 0 3 C6 AE 4 6 2 D1 SI M R1 R1 R1 R- 1 A3 AE 3 1 2 Si m A3 AE 3 1 2 Si m A3 AE 3 1 2 Si m AE 4 6 2 A3 AE 4 6 2 B3 D2 AE 4 6 2 D3 AE 4 6 2 AE 3 0 6 E4 11 " 1' - 3 " 7' - 4 " 1' - 4 " 3' - 1 " 3' - 8 " 6' - 0"3' - 8" 8"1' - 8" 3' - 8"4' - 4"3' - 8"8' - 4"3' - 4"8" BA C K S T O P N E T T I N G BA C K S T O P N E T T I N G 12 ' - 8 " 1 ' - 3 " 7 ' - 4 " 1'- 4 " W1 2 AR T I F I C I A L B O X W O O D S C R E E N CO V E R I N G F U L L E X T E N T O F WA L L A N D D O O R 1 2 '-0 " 7 9' - 0 " 2. 0 ° A E 1 0 2 C A E 1 0 2 A 49' - 4"14' - 0"34' - 0" 3' - 4"12' - 0"3' - 4"12' - 0"3' - 4" 3 0' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 18' - 0"13' - 0"23' - 8"97' - 4"8' - 2"11' - 9" A2 0 . 9 A2 3 AL T . P E R I M E T E R S L A B - S E E S T R U C T U R A L 1' - 8"1' - 8" 1' - 8" 1' - 8 " 5' - 2 " 1' - 8 " 1' - 8 " 5' - 2 " 71 ' - 1 0 " 23 ' - 5 " 10 ' - 0 " 12 ' - 0 " 4' - 7 " 18 ' - 6 " 13 ' - 4 " 5' - 2 " 26 ' - 8 " 22 ' - 6 " 1' - 8"1' - 8" 1' - 8 " 22 ' - 7 " 4"4" 1' - 8 " 12 ' - 8 " 43 ' - 4 " 4' - 0 " 8"19' - 0"3' - 10"10" 1' - 5" 10' - 4"25' - 8" DR - 1 R- 1 R1 R1 R1 R- 2 D R- 2 D R- 2 D R1 R1 R1 R- 1 R- 2 D DR - 1 4' - 0 " 4' - 0 " WS 1 S 6 8' - 0"3' - 8"9' - 0" 20' - 8"2' - 8"6' - 0" 9' - 4"1' - 4"10' - 0"3' - 8"10' - 0"1' - 4"8' - 4"3' - 8"4" +/- 2 2' - 1 0 1 /2 " 70.0° 110.0° +/ - 9 ' - 7 " DR - 1 8 " M I N . 3 0 " 8 "S E AT I N GREMOVABLE M I N . 3 6 " S E AT I N GREMOVABLE R- 2 D R- 1 R1 R1 R1 DR - 1 M I N . 3 0 " S E AT I N GREMOVABLE R- 2 D 8 " SEAT ING REMO V A B L E DR - 1 R- 2 C R- 2 C CE . 9 A L I G N AE 2 0 7 1 2B 0 2 A 2B 0 2 B 5" S l a b on Gr a d e B 2B 1 0 A B F- 3 G A T E “D e l e t e t h e i n t e r i o r g y p s u m bo a r d f r o m a l l t h e f r a n c h i s e r e t a i l an d r e s t a u r a n t s h e l l s s p a c e s an d d e f e r t o h a v e t h a t m a t e r i a l in s t a l l e d a s p a r t o f t h e f u t u r e up f i t p a c k a g e f o r e a c h o f t h o s e sp a c e s ” C RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 B 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 02 / 2 3 / 2 0 1 7 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 2/27/2017 3:32:30 PMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R14_Feb 2017_BlainJ.rvt AR C H I T E C T U R A L FL O O R P L A N CO N C O U R S E L E V E L AR E A B OW N E R No r t h A u g u s t a B a l l p a r k D e v e l o p m e n t Ci t y o f N o r t h A u g u s t a , S C 10 0 G e o r g i a A v e n u e No r t h A u g u s t a , S C 2 9 8 6 1 No r t h A u g u s t a Ba l l p a r k AE 1 0 2 B Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 8 " = 1 ' - 0 " CO N C O U R S E L E V E L - A R E A B A6 RE V I S I O N D A T E DE S C R I P T I O N B 0 5 / 0 6 / 2 0 1 5 A d d e n d u m B C 0 5 / 1 5 / 2 0 1 5 A d d e n d u m C AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 26 of 34 UP F E F E C FEC FE AIR IN AIR OUT AE 2 1 0 E6 DD DE DH A3 1 A3 0 A2 9 A2 8 A2 7 22 21 23 24 25 25 A2 6 A2 5 A2 4 20 20 19 A2 2 A2 1 DADB DF DG BD . 8 A2 0 A1 9 CACA CB CC CD CF CG CH AE 2 1 1 A6 A1 AE 3 0 2 C1 AE 3 0 2 DA T A 3B 0 4 EL E C T R I C A L 3B 0 6 ST A I R 2 3B 0 5 ST O R A G E 3B 0 7 HV A C R O O F YA R D 3B 1 8 WO M E N ' S TO I L E T 3B 1 1 ME N ' S TO I L E T 3B 1 2 FO O D PR E P . 3B 1 4 FA M I L Y TO I L E T 3B 1 3 CL U B LO U N G E 3B 1 5 BC C1 AE 5 1 4 A6 AE 3 0 6 AE 4 6 3 D1 RO O F GA R D E N TE R R A C E 3B 1 6 CL U B BR I D G E 3B 0 2 PR E F U N C T I O N 3B 0 8 PR E F U N C T I O N BA L C O N Y 3B 0 9 CL U B LO U N G E CO R R I D O R 3B 1 9 EL E V A T O R 2 3B 0 1 AE 4 5 1 D1 AE 4 5 7 C2 D4 AE 3 0 5 B4 AE 3 0 5 A6 AE 3 0 4 A6 AE 3 0 5 AE 2 0 2 A4 B6 AE 3 0 5 1 ' - 7 " 1 ' - 0 " 1 4 ' - 0 " 1' - 0 " 1 4' - 0 " 1' - 0 " 1 4' - 0 " 1' - 0 " 1 4' - 0 " 1' - 0 " 7 ' - 8 " 3' - 4 " 2 ' - 3 " WS 1 S 6 3B 1 0 A 3B 2 0 A 3B 1 1 A A6 A4 WS 1 S 6 3B 0 6 A 3B 0 5 B WM 4 S 6 WS 1 S 6 D1 AE 3 1 6 AE 1 0 3 B AE 1 0 3 A AE 1 0 3 D AE 1 0 3 B AE 1 0 3 D AE 1 0 3 B D2 AE 3 1 6 AE 4 3 1 E5 3B 0 7 A 3B 0 5 A 3B 1 8 A 3B 1 2 A 3B 1 3 A 3B 1 4 A 1A 4 1A 4 ST O R A G E RO O M 3B 1 0 JA N CL O S E T 3B 2 0 AE 4 6 2 E2 AE 2 0 9 A5 3A 2 1 A 1 2 0' - 0 " 6' - 0 3 /8 " 1 8 ' - 5 5 /8 " AE 2 0 3 B6 D6 AE 3 0 5 AE 2 1 0 B6 B3 C3 BD WS 1 S 6 WM 4 S 6 S 1 WM 4 S 6 S 1 WM 4 S 6 R- 2 A R- 2 A R- 2 A R- 2 A R- 2 A PA I N T E D M E T A L PL A N T E R B O X O N LE G S T Y P . N. I . C . A4CU S T O M B U I L T I N D I S P L A Y C A S E WS 1 S 6 PO R T A B L E B A R AD AD AD AD AD AD AD RDRD R1 AE 2 0 7 3B 1 5 A 3B 1 5 B AE 2 0 2 C5 B4 1' - 1 1 " 3' - 8"3' - 8" 3' - 8 " 5' - 0 " 3' - 8 " 5' - 0 " ST A I R 3 37 1 19 ' - 0 " 19' - 0" 5' - 0" 6' - 0 " 1 0 " 6' - 0 1 / 4 " A4 - z 1A 6 1' - 2 " VE S T I B U L E 3B 0 5 A 1' - 9 " AE 4 3 1 A3 3B 1 9 A 3B 1 9 B 3B 1 5 F 3B 0 4 A R- 3 B WS 1 S 6 R- 3 A R1 R- 3 A R- 3 B R- 3 B R- 3 A R- 3 B R- 3 B R1 R1 R- 3 B R- 3 A R- 3 B R1 R- 3 A R- 3 B R- 3 B R1 R- 3 B 9 ' - 2 " 6 ' - 3 " 5' - 9 " 2' - 1 " 3 ' - 5 " 1 9 ' - 0 " 5' - 6 " R- 4 C6 R- 2 A ST A M P E D CO N C R E T E SC O R E D C O N C R E T E SE E A F 1 0 3 B RA M P R- 6 HA N D R A I L M O U N T E D T O W A L L TY P I C A L BE N C H N . I . C . 3B 1 5 D 3B 1 5 E WS 1 S 4 S 1 AE 2 3 1 D6 AE 5 0 2 E3 R- 2 A 8' - 2"15' - 4"15' - 4"17' - 4"23' - 0"7' - 8"15' - 4"27' - 5"8' - 10"21' - 7" AE 5 1 5 A4 DC E6 AE 3 1 2 WP 1 S 4 WP 1 S 4 WP 2 S 4 WP 1 S 4 AE 2 0 3 C6 W2 7 - B W2 7 - B W2 9 W2 6 - B W2 7 - B W2 7 - B W2 8 W3 0 W2 5 - B W3 2 W2 2 W3 5 W2 1 - A W2 7 - A W2 6 - A W2 6 - A W2 7 - A R- 3 B C3 1 ' - 6 " . S L O P E T O E D G E R- 2 A 3' - 8" 10 ' - 1 " 13 ' - 5 " 4 '- 7 " W3 7 - S W3 8 - S W3 8 - S W3 8 - S W4 0 - S AE 3 0 6 E3 AD AD AD 8'-10" A2 0 . 9 A2 3 2'-4" CE . 9 3' - 6" 1 0.0° 1 / 2 " T O T A L OV E R F L O W SC U P P E R OV E R F L O W SC U P P E R B1 AE 5 1 2 B1 AE 5 1 2 3 0' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " R1 R1 R1 R1 R- 3 A AE 2 0 7 1 AE 5 1 6 B5 AE 5 1 6 A5 A 06 4 9 1 9 E X T E R I O R WO O D S H U T T E R S HI N G E D I N T O S T O R E FR O N T S Y S T E M F O R AC C E S S T O C L E A N GL A S S . S E E W 3 5 S 15 ' - 0 " 10 ' - 0 " B PA I N T E D M E T A L PL A N T E R B O X O N LE G S T Y P . N. I . C . PA I N T E D M E T A L PL A N T E R B O X O N LE G S T Y P . N. I . C . B B B B SI M . 3 E Q . B A Y S B CO R N E R MU L L I O N TY P . AE 5 1 5 A4 TY P C AE 5 1 5 A4 TY P AE 5 1 5 A4 TY P AE 5 1 5 A4 TY P C C C AE 5 1 5 A4 TY P C C AE 5 1 5 B4 TY P C AE 5 1 5 B4 TY P AE 5 1 5 A4 TY P DR - 3 11'-10"1'-9" 1'-9"11'-10" 11'-10"1'-9"11'-10"1'-9" 5 RF I - 0 1 5 5 RF I - 0 1 5 5 RF I - 0 1 5 6 R E C E S S E D A N C H O R T I E S FO R T E N T T I E D O W N 5 2 T0 0 0 3 T0 0 0 10 8" 16 ' - 7 " 2' - 5 " 8" 8"7' - 0 1/2"11' - 11 1/2"8" 8" 8" 16 ' - 7 " 2' - 5 " 8" EQEQ 8" 12 C3 AE 1 0 4 . 2 AE 4 3 1 E6 SU I T E 1 3A 0 1 SU I T E 2 3A 0 2 3A 0 2 A 3A 0 1 A DR - 3 3A 0 2 B 3A 0 1 B WS 1 S 6 WS 1 S 6 6 ' - 9 " WS 1 S 6 W1 9 SI M . A2 SL 0 0 2 B2 SL 0 0 2 13 ' - 2 " 13 ' - 5 " 8'-6"12'-8"17'-9"8'-3"5'-8 1/2" 2'- 9 " 2' - 9 " 1'- 0 " 15 RF I - 1 8 0 15 RF I - 1 8 0 15 RF I - 1 8 0 15 RF I - 1 8 0 4 ' - 0 " 1 5 ' - 8 " 4 ' - 0 "3 ' - 2 " 4 ' - 0 " 6 " 6 "4' - 0 " 4 ' - 0 " 1 5 ' - 8 " 3 ' - 2 " 4 ' - 0 " 1' - 6 " 4 ' - 0 " 4 ' - 0 " 1' - 6 " 1' - 7 "4' - 0 " 1 ' - 7 "4 ' - 0 " 15 RF I - 1 9 7 15 RF I - 1 9 7 15 RF I - 1 9 7 15 RF I - 1 9 7 15 RF I - 1 9 7 5 .5 ° 4 ' - 0 " 15 RF I - 1 9 7 15 3 3 / 4 " 1 1 ' - 4 3 /4 " 1' - 6 " 6" 6"7" to stud 5 1/2" WS 3 S 4 22 22 24 3' - 0 " 10 ' - 3 " 10 ' - 4 " 3' - 0 " #2 1 R A M P L I G H T S AD D 2 A R E A D R A I N S , C O N N E C T TO R O O F D R A I N P I P E I N T O I L E T RO O M 2 B 0 4 C E I L I N G 31 RF I - 4 7 4 31 RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 B 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 4/ 2 7 / 2 0 1 8 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 4/27/2018 9:35:31 AMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R16_Feb 2017_BlainJ.rvt AR C H I T E C T U R A L FL O O R P L A N CL U B / S U I T E L E V E L AR E A B No r t h A u g u s t a Ba l l p a r k AE 1 0 3 B Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 8 " = 1 ' - 0 " CL U B / S U I T E L E V E L A R E A B A6 A RE V I S I O N D A T E DE S C R I P T I O N A 0 4 / 2 4 / 2 0 1 5 A d d e n d u m A B 0 5 / 0 6 / 2 0 1 5 A d d e n d u m B C 0 5 / 1 5 / 2 0 1 5 A d d e n d u m C 5 2 / 2 3 / 2 9 0 1 7 M o d i f i c a t i o n 5 10 4 / 2 0 / 2 0 1 7 M o d i f i c a t i o n 1 0 12 6 / 2 2 / 2 0 1 7 M o d i f i c a t i o n 1 2 15 8 / 1 0 / 2 0 1 7 M o d i f i c a t i o n 1 5 22 1 0 / 2 3 / 2 0 1 7 M o d i f i c a t i o n 2 2 24 1 1 / 2 9 / 2 0 1 7 M o d i f i c a t i o n 2 4 31 4 / 2 7 / 2 0 1 8 M o d i f i c a t i o n 3 1 10'-0" AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 27 of 34 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 05 C a m p a n i l e - Ro o f L e v e l 18 7 ' - 0 " (4 8 ' - 0 " ) AE 2 0 4 B6 AE 2 0 4 D6 AE 2 0 4 A6 04 C a m p a n i l e 17 6 ' - 4 " (3 7 ' - 4 " ) 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 05 C a m p a n i l e - Ro o f L e v e l 18 7 ' - 0 " (4 8 ' - 0 " ) A5 AE 5 1 2 04 C a m p a n i l e 17 6 ' - 4 " (3 7 ' - 4 " ) 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) AE 2 0 3 A6 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 02 R e s t a u r a n t L e v e l 15 4 ' - 8 " (1 5 ' - 8 " ) 05 C a m p a n i l e - Ro o f L e v e l 18 7 ' - 0 " (4 8 ' - 0 " ) AE 2 0 3 D5 AE 2 0 4 B3 AE 2 0 5 A6 AE 2 0 2 D6 AE 2 0 2 A6 04 C a m p a n i l e 17 6 ' - 4 " (3 7 ' - 4 " ) 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) AE 2 0 3 B2 RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 02 / 2 3 / 2 0 1 7 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 2/24/2017 2:23:58 PMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R14_Feb 2017_BlainJ.rvt OV E R A L L EL E V A T I O N S OW N E R No r t h A u g u s t a B a l l p a r k D e v e l o p m e n t Ci t y o f N o r t h A u g u s t a , S C 10 0 G e o r g i a A v e n u e No r t h A u g u s t a , S C 2 9 8 6 1 No r t h A u g u s t a Ba l l p a r k AE 2 0 1 Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 1 6 " = 1 ' - 0 " NO R T H E L E V A T I O N C6 1 / 1 6 " = 1 ' - 0 " SO U T H E L E V A T I O N B6 1 / 1 6 " = 1 ' - 0 " WE S T E L E V A T I O N O V E R A L L A6 RE V I S I O N D A T E DE S C R I P T I O N AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 28 of 34 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) A2 7 A2 6 A2 5 A2 4 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) E4 AE 4 6 2 D4 AE 3 0 5 B6 AE 3 0 5 CJ CJ W1 0 W1 0 04 C a m p a n i l e 17 6 ' - 4 " (3 7 ' - 4 " ) E6 AE 4 6 2 CJ CJ CJ CJ W7 2 1 4 3 5 6 3 6 5 3 1 2 1 5 14 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) D6 AE 4 6 2 01 C o n c o u r s e L e v e l 13 9 ' - 0 " 03 A p a r t m e n t L e v e l 1 16 9 ' - 0 " 04 A p a r t m e n t L e v e l 2 17 9 ' - 8 " 02 O f f i c e L e v e l 15 3 ' - 0 " 01 . 5 B a t C a g e L e v e l 14 3 ' - 0 " 2. 5 B a t t i n g C a g e R o o f 15 9 ' - 0 " AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . 22 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) DD DE DH DJ DA DB A6 AE 3 0 5 G3 CJ CJ CJ CJ CJ CJ 2 1 9 4 14 1 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) 10 17 PA I N T E D L O O S E L I N T E L 10'-0" 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) DB 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) A2 AE 3 0 6 05 C a m p a n i l e - Ro o f L e v e l 18 7 ' - 0 " (4 8 ' - 0 " ) 04 C a m p a n i l e 17 6 ' - 4 " (3 7 ' - 4 " ) DC 16 16 2' - 4"0"10' - 8" 5 2 1 12 4 1111 ST I L E A N D R A I L LO U V E R E D W O O D D O O R AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . 22 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) A3 1 A3 0 A2 9 A2 8 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) B4 AE 3 0 5 W1 0 W1 0 CJ CJ CJ 3 5 6 3 6 2 1 613 3 5 01 C o n c o u r s e L e v e l 13 9 ' - 0 " 03 A p a r t m e n t L e v e l 1 16 9 ' - 0 " 02 O f f i c e L e v e l 15 3 ' - 0 " 01 . 5 B a t C a g e L e v e l 14 3 ' - 0 " 2. 5 B a t t i n g C a g e R o o f 15 9 ' - 0 " AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . AE 2 0 2 C6 TY P . 22 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) B2 AE 3 1 7 02 R e s t a u r a n t L e v e l 15 4 ' - 8 " (1 5 ' - 8 " ) HF HB HC HD HE HA R2 - E DR - 2 DR - 2 R- 2 A DR - 2 DR - 2 F- 2 2D 1 3 A DR - 2 R- 2 A A4 AE 4 6 3 A3 AE 4 6 3 RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 B D 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 10 / 2 3 / 2 0 1 7 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 10/24/2017 10:25:08 AMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R16_Feb 2017_BlainJ.rvt EN L A R G E D EL E V A T I O N S BU I L D I N G B No r t h A u g u s t a Ba l l p a r k AE 2 0 3 Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 4 " = 1 ' - 0 " EX T E R I O R E L E V A T I O N W E S T - R E T A I L D5 1 / 4 " = 1 ' - 0 " EX T E R I O R E L E V A T I O N S O U T H - B U I L D I N G B B6 Nu m b e r No t e 1 EX T E R I O R M A S O N R Y C A V I T Y W A L L S Y S T E M 2 ME T A L C O P I N G F L A S H I N G A T P A R A P E T 3 AL U M I N U M S T O R E F R O N T S Y S T E M 4 RO W L O C K B R I C K A T W A T E R T A B L E 5 EX P O S E D S T E E L S T R U C T U R E - P A I N T E D 6 PA I N T E D S T E E L C A N O P Y 7 8" S O L D I E R B R I C K A T W I N D O W S I L L S 9 GA L V A N I Z E D S T E E L F E N C E A N D G A T E S S E E P L A N S F O R T Y P E 10 WA T E R F O U N T A I N F O R E X T E R I O R C O N D I T I O N S 11 WO O D C O M P O S I T E S H U T T E R S MO U N T E D W I T H I N S T O R E F R O N T SY S T E M 12 SI D I N G W A L L S Y S T E M 13 TH R O U G H W A L L S C U P P E R 14 4" R O W L O C K & 8 " S O L D I E R B R I C K B A N D 15 CO M P O S I T E W O O D C O R N I C E 16 SP E C I A L M O D U L A R B R I C K B A S K E T W E A V E P A T T E R N 17 8" S O L D I E R B R I C K B A N D EX T E R I O R E L E V A T I O N K E Y N O T E S 1 / 4 " = 1 ' - 0 " SO U T H E L E V A T I O N O F T O W E R C6 1 / 4 " = 1 ' - 0 " Co p y o f E X T E R I O R E L E V A T I O N W E S T - R E T A I L B2 1 / 4 " = 1 ' - 0 " HO M E R U N P O R C H E X T E R I O R E L E V A T I O N A6 RE V I S I O N D A T E DE S C R I P T I O N 22 1 0 / 2 3 / 2 0 1 7 M o d i f i c a t i o n 2 2 11'-0" AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 29 of 34 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) A3 1 A3 0 A2 9 A2 8 A2 7 A2 6 A2 5 A2 4 A2 2 A2 1 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) E4 AE 4 6 2 A6 AE 3 0 6 D4 AE 3 0 5 B4 AE 3 0 5 30' - 0" B6 AE 3 0 5 SL A B O N G R A D E 4" G R A V E L B E L O W VA P O R B A R R I E R ( T Y P ) EL E V A T O R VE S T I B U L E 2B 0 2 FR A N C H I S E 6 S H E L L 2B 3 0 RE T A I L 1 SH E L L 2B 4 0 RE T A I L 2 SH E L L 2B 5 0 AE 3 1 2 C1 RS - 3 RS - 1 RS - 3 RO O F GA R D E N TE R R A C E 3B 1 6 CL U B BR I D G E 3B 0 2 E6 AE 4 6 2 9' - 9" FR A N C H I S E 5 S H E L L 2B 2 0 AE 3 1 2 A3 AE 3 1 2 A3 AE 3 1 3 D1 D6 AE 4 6 2 JO G I N S E C T I O N SE E P L A N A2 3 C3 AE 1 0 4 . 2 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) DH DA DB DF DG 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) C1 AE 5 1 4 D5 AE 4 6 2 A6 AE 3 0 5 HV A C R O O F YA R D 3B 1 8 FR A N C H I S E 6 S H E L L 2B 3 0 G3 AE 3 1 2 C3 AE 3 1 3 D2 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) PA I N T E D G Y P FA S C I A A N D SO F F I T AE 3 0 4 D1 Si m AE 5 1 4 E3 AE 5 1 4 E3 D2 AE 4 6 2 D3 AE 4 6 2 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) DH DF DG 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) D5 AE 4 6 2 A6 AE 3 0 5 A2 AE 3 0 6 AE 3 1 2 C2 ME N ' S TO I L E T 2B 0 4 ST O R A G E 2B 1 5 DA T A 3B 0 4 EL E C T R I C A L 3B 0 6 ST O R A G E 3B 0 7 PR E F U N C T I O N 3B 0 8 CO N C O U R S E 2B 0 8 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) DC 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) BC 00 G r a d e 13 7 ' - 0 " (- 2 ' - 0 " ) WS 1 S 4 SI D I N G W A L L F I N I S H F A C I N G P R E F U N C T I O N S P A C E EL A S T O M E R I C G Y P S O F F I T IN S U L A T E S O F F I T AN D F A S C I A W A L L S BA S E B I D I S T H E 0 7 4 2 3 6 P H E N O L I C WA L L P A N E L S . PR O V I D E A L T E R N A T E P R I C E F O R T H E S E 3 S U R F A C E S T O B E F I N I S H E D W I T H FI B E R C E M E N T P A N E L W P 2 S 4 W A L L S T O MA T C H O U T S I D E P O R T A L W A L L S . 1' - 4"8' - 0" R- 4 RS - 2 AE 5 1 2 A1 AE 3 1 6 C2 RE V E A L . A L I G N W I T H W P 2 S 4 WA L L R E V E A L S . 7' - 3 1 / 2 " 1' - 1 " 6" AE 5 1 4 E3 16 4 ' - 1 1 / 2 " 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) DD DE DJ 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) A6 AE 3 0 5 RE T A I L 2 SH E L L 2B 5 0 AE 3 1 2 A1 RS - 3 WO M E N ' S TO I L E T 2B 1 1 RO O F GA R D E N TE R R A C E 3B 1 6 CL U B LO U N G E 3B 1 5 6' - 0"10' - 4" 16' - 4" CO L D F O R M M E T A L F R A M I N G 2'-2 1/2" WO O D G R A I N S T A M P E D CO N C R E T E RS - 3 AE 3 0 5 C2 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) 02 R e s t a u r a n t L e v e l 15 4 ' - 8 " (1 5 ' - 8 " ) RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 B 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 10 / 2 3 / 2 0 1 7 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 10/24/2017 2:48:30 PMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R16_Feb 2017_BlainJ.rvt BU I L D I N G S E C T I O N S - A R E A B No r t h A u g u s t a Ba l l p a r k AE 3 0 5 Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 4 " = 1 ' - 0 " BL D G S E C T I O N @ F R A N C H I S E B U I L D I N G B A6 1 / 4 " = 1 ' - 0 " BL D G S E C T I O N @ F R A N C H I S E B U I L D I N G B D4 1 / 4 " = 1 ' - 0 " BL D G S E C T I O N @ C L U B / S U I T E E N T R Y B6 1 / 4 " = 1 ' - 0 " SE C T I O N @ P R E F U N C T I O N D6 1 / 4 " = 1 ' - 0 " BL D G S E C T I O N @ F R A N C H I S E B U I L D I N G B B4 RE V I S I O N D A T E DE S C R I P T I O N TB D R F I s DA S H L I N E I N D I C A T E D CO N T I N U O U S W A T E R P R O O F I N G SE E E 6 / A E 5 0 1 F O R RO O F S Y S T E M 3 / 4 " = 1 ' - 0 " RO O F T E R R A C E W A L L C2 SE E E 6 / A E 5 0 1 F O R RO O F S Y S T E M 1/ 2 " S H E A T H I N G 4" I N S U L A T I O N DA S H L I N E I N D I C A T E D CO N T I N U O U S W A T E R P R O O F I N G DR A I N B O A R D DR A I N B O A R D RF I - 1 4 1 11'-4" 13'-6 1/2" 12'-1" 12'-0" AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 30 of 34 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) CH CJ 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) FI R S T B A S E CO N C O U R S E 2A 0 5 FR A N C H I S E 3 S H E L L 2A 3 0 RS - 1 SU I T E CO R R I D O R 3A 2 0 WS 1 S 6 HE A T E D A N D I N S U L A T E D UT I L I T Y S O F F I T WM 4 S 6 AE 5 1 4 D3 AE 5 1 1 C1 EL A S T O M E R I C C O A T E D G Y P S O F F I T EL A S T O M E R I C C O A T E D G Y P F A S C I A MI S C E L A N O U S S T E E T U B E - S E E S T R U C T U R A L BD . 8 CL U B LO U N G E 3B 1 5 PA I N T E D S T E E L C H A N N E L PA I N T E D S T E E L C A N O P Y ST O R E F R O N T WI N D O W S Y S T E M 10' - 0 1/2" WS 1 S 6 SC U P P E R SC U P P E R B R E A K M E T A L SH A D O W B O X PL A T E B E Y O N D AE 5 1 4 E2 AE 5 1 4 B1 17 1 ' - 7 " 2'-7"22 BD . 8 RS - 1 AE 5 1 4 E2 HV A C R O O F YA R D 3B 1 8 WO M E N ' S TO I L E T 3B 1 1 17 1 ' - 7 " 2'-7"22 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) 03 R o o f L e v e l 16 9 ' - 0 " (3 0 ' - 0 " ) 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) AE 5 1 4 E2 SU I T E CO R R I D O R 3A 2 1 AE 5 1 2 E1 ST O R E F R O N T S Y S T E M EX T E R I O R W O O D S H U T T E R GL A Z E D I N T O S T O R E F R O N T SY S T E M NO S H U T T E R I N T O P B A Y SE E A E 5 1 6 F O R MO R E D E T A I L S 2'-7" 17 1 ' - 7 " 22 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) WM 4 M 8 ME T A L C O P I N G 6" C O N C R E T E RA I S E D P A D AS R E Q U I R E D B Y TR A N S F O R M E R 6" SI D E W A L K SE E C I V I L BE E R G A R D E N CO N C R E T E S L A B BI E R GA R D E N 2D 0 2 F- 3 G A T E BR I C K W A T E R T A B L E 8" T A L L S O L D I E R B R I C K B A N D AE 5 1 4 A4 HV A C R O O F YA R D 3B 1 8 AE 5 1 4 B4 11'-4" 16 6 ' - 8 " 22 22 02 C l u b / S u i t e L e v e l 15 5 ' - 4 " (1 6 ' - 4 " ) A2 7 1. 5 L o w R o o f 15 2 ' - 4 " (1 3 ' - 4 " ) HV A C R O O F YA R D 3B 1 8 RO O F GA R D E N TE R R A C E 3B 1 6 RA M P GU A R D R A I L WM 4 S 6 S 1 SO L D I E R C O U R S E ME T A L C O P I N G 27 ' - 4 " CF M F AE 5 1 4 A1 Si m 16 6 ' - 8 " 11'-4" 22 22 01 C o n c o u r s e L e v e l 13 9 ' - 0 " (0 ' - 0 " ) 00 M a i n t e n a n c e 12 8 ' - 6 " (- 1 0 ' - 6 " ) 13 8 ' - 1 0 1 / 2 " 13 9 ' - 0 " 13 4 ' - 7 1 / 2 " 13 4 ' - 5 1 / 4 " 13 2 ' - 7 1 / 2 " 13 0 ' - 7 1 / 2 " 13 2 ' - 5 1 / 4 " 13 0 ' - 5 1 / 4 " 12 8 ' - 7 1 / 2 " 6 " 6 " 6 " 2' - 6" 13 1 ' - 0 " WA L L B E Y O N D 13 9 ' - 1 0 " 9 RF I - 0 5 7 R- 2 B R- 2 A R- 2 C 13 6 ' - 1 1 3 / 8 " RA I L R O A D A V E N U E CENTER STREET TR U E PR O J E C T N O : OD E L L A S S O C I A T E S I N C . c 20 1 5 SH E E T I D E N T I F I E R CH A R L O T T E , N C R I C H M O N D , V A CO N S U L T A N T P. I . C . P M G R . P A R C H . DE S I G N B Y JO B C A P T A I N DR A W N B Y CH E C K E D B Y SH E E T T I T L E 80 0 W . H i l l S t r e e t Th i r d F l o o r Ch a r l o t t e , N C 2 8 2 0 8 (T ) 7 0 4 - 4 1 4 - 1 0 0 0 ( F ) 7 0 4 - 4 1 4 - 1 1 1 1 ww w . o d e l l . c o m IS S U E D A T E DE S C R I P T I O N SD 0 7 / 1 0 / 2 0 1 4 S C H E M A T I C D E S I G N FU L L S E T I S S U E S AD D E N D A O R M O D I F I C A T I O N DD 1 0 / 1 7 / 2 0 1 4 D E S I G N D E V E L O P M E N T CD 1 1 / 3 / 2 0 1 4 2 0 % C O N S T R U C T I O N D O C U M E N T S 65 4 3 2 ABCE ABCE D D 1 KE Y P L A N 65 4 3 2 1 02 / 1 7 / 2 0 1 5 G M P P R I C I N G D O C U M E N T S CD 03 / 1 7 / 2 0 1 5 Q U A L I T Y A S S U R A N C E S E T CD 04 / 0 8 / 2 0 1 5 C O N S T R U C T I O N D O C U M E N T S CD Template Version: Old Crow 10 / 2 3 / 2 0 1 7 02 / 2 3 / 2 0 1 7 C O N S T R U C T I O N D O C U M E N T S CD 10/23/2017 9:19:11 AMD:\Revit Local\3997-000_N_Augusta_Ballpark_CD_R16_Feb 2017_BlainJ.rvt WA L L S E C T I O N S - AR E A B No r t h A u g u s t a Ba l l p a r k AE 3 1 3 Gr e e n J a c k e t s B a s e b a l l 39 9 7 - 0 0 0 M. W O O L L E N M. A . M. W O O L L E N J. B L A I N A. H E R S E Y J. H E N D R I C K S - 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ S T O R E F R O N T - L A R G E B A Y A2 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ C L U B / L O U N G E P A T I O D4 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ M E C H . Y A R D D3 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ F R A N C H I S E / S U I T E C O R R I D O R D5 1 / 2 " = 1 ' - 0 " TR A N S F O R M E R E N C L O S U R E C1 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ M E C H . Y A R D D2 1 / 2 " = 1 ' - 0 " WA L L S E C T I O N @ M E C H . Y A R D D1 1 / 4 " = 1 ' - 0 " PI C N I C W A L L S E C T I O N A5 RE V I S I O N D A T E DE S C R I P T I O N 9 4 / 1 8 / 2 0 1 7 M o d i f i c a t i o n 9 22 1 0 / 2 3 / 2 0 1 7 M o d i f i c a t i o n 2 2 AT T A C H M E N T #7 - Ag r e e m e n t In f o r m a t i o n Pa g e 31 of 34 PO Box 21273 Columbia, SC 29221 803.786.4610 (O) 7416 Fairfield Rd. Columbia, SC 29203 803.786.0952 (F) December 23, 2025 To: B&G Jason Wood RE: SRP Repairs: Based on Williamson and Associates report dated 11-19-2025 Watts and Associates Waterproofing LLC is pleased to offer the following proposal for the above-referenced project. We hereby propose to furnish the necessary labor, material, equipment, tools, transportation, insurance, and supervision to perform the following scope of work during normal business hours. This proposal is broken out into spec sections for accounting purposes. General conditions are divided into each unit. South Side of South facing screen wall (Terrace) 1. Install new sheet membrane waterproofing to the horizontal slab and new wall termination 12” above thru-wall flashing 2. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions 3. North Side of South facing screen wall (Mech. Roof) 1. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions 2. West Side of West facing screen wall (Mech. Roof) 1. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions 2. East Side of West facing screen wall (Mech. Roof) 1. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions 2. Door at the South side of the screen wall 1. Inspect and repair AWB and WPFG WOW South terrace side of screen wall 1. Install new sheet membrane waterproofing to the horizontal slab and new wall termination 12” above thru-wall flashing 2. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions 3. Install new traffic coating system with new caulking at the frame WOW North side of screen wall 1. Install AWB to sheathing above the waterproofing per the manufacturer's written instructions Note: This is a budget price based on the information given. It does not include any demo or unforeseen issues. Quote: $27,000.00 Authorized By: Kip McCoy, Managing Partner 803-309-0193 Kip@Wattswaterproofing.com ATTACHMENT #7 - Agreement Information Page 32 of 34 PO Box 21273 Columbia, SC 29221 803.786.4610 (O) 7416 Fairfield Rd. Columbia, SC 29203 803.786.0952 (F) • Commercial Roofing • December 23, 2024 Budget Pricing To: B&G, Jason Wood From: Scott Mathias (SC License G11615) Project: SRP Park Repairs Scope of Work: All pricing is based on the work outline and pricing will change with changes in scope and unforeseen conditions. Price includes: A. Repairs to screen wall 1. South Terrace - no work for WAR 2. North (Mech Roof) Item a. Demo - non included Item b. i no work included ii inspect and add mechanical termination as needed iii install TPO up wall with new dens deck sheathing. iv install salvage coping 3. b. Check TPO as stated c. Repair as needed (scope will be discussed once opened and reveal situation) 4. Same as 3. 5. No work for WAR B. Repairs to WOW club lounge 1. No work for WAR. 2. No work for WAR Budget Pricing to include materials, labor, and travel time: $29,300.00 (this pricing is based on the information provided and will change with changes in scope) Notes: • GC to provide permits and dumpsters • Owner to provide an agreed upon area for material storage on site • Owner to provide an agreed upon access point to roof with enough room for crane, equipment, vehicles, and portable restroom • contact estimating@wattsroofing.com with any questions or concerns ATTACHMENT #7 - Agreement Information Page 33 of 34 1965 International Court Ph: 706-799-4228 Grovetown, Georgia 30813 PROPOSAL To: Brasfield & Gorrie Date: 12-9-24 Job: SRP Park Water Damage Repairs Labor and material to install the following scope of work: 1. Labor to demo z-furring, wall framing, sheathing, rigid insulation and lap siding. 2. Labor to cut back horizontal legs of shelf angle and bent plate mentioned in item A1a of Williamson & Associates report. 3. Labor and material to install new bypass framing for continuous wall assembly from top of screen wall to lower slab. 4. Labor and material to re-frame structural stud framing for ramp. NO decking included. 5. Labor and material to install new sheathing over bypass wall. 6. Labor and material to install new 5/8” Dens-Deck Prime sheathing over existing framing at mechanical well side of screen wall where removed. 7. Labor and material to reinstall 2” z-girts and rigid insulation where removed from WOW Club exterior wall. 8. G.C. to furnish dumpsters, temporary lights and temporary power. 9. NO metal or wood blocking/backing included. 10. NO rigid insulation included. 11. NO air/weather barrier work included. 12. NO night or weekend work included. 13. ALL demo work figured to occur in one mobilization. 14. Due to the volatility in the materials market, this quote is good through 1-31-25. 15. All above work is based off report from Williamson & Associates. Any additional work not mentioned in report or that comes from further investigation after demo work is performed is not included. Total Price Labor, Material and Equipment: $37,012.00 - Alternate add allowance for interior drywall repairs (includes painting at affected areas)…$12,000.00 o Interior work could not be viewed in entirety at time of this proposal. This is an allowance and additional costs may be incurred once project starts. - Alternate add allowance for dumpsters, temporary protection, temporary fencing, expendables and final cleaning…$30,000.00 ATTACHMENT #7 - Agreement Information Page 34 of 34