Loading...
RES 2020-59 Adopted RESOLUTION NO. 2020-59 A RESOLUTION AUTHORIZING THE ACCEPTANCE OF THE LOW BID OF SD CLIFTON CONSTRUCTION. INC. FOR THE CONSTRUCTION OF NORTH AUGUSTA DEPARTMENT OF PUBLIC SAFETY STATION I. WHEREAS, the City has determined, that it is in the City's best interest to construct a facility known as North Augusta Department of Public Safety Station I, such facility to be constructed on Martintown Road; and WHEREAS, the City in accordance with its procurement code, sought bids for such project; and WHEREAS, the lowest complying bid received for the work identified was by SD Clifton Construction, Inc. with a total base bid of$3,361,000.00; and WHEREAS, the Mayor and City Council has determined that it is in the best interest of the City that the City move forward with such project by accepting the base bid of SD Clifton Construction, Inc. NOW THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of North Augusta, South Carolina, in meeting duly assembled and by the authority thereof, that the City enter into a contractual arrangement with SD Clifton Construction, Inc. to construct the facility as above described, with such specific contractual documents to be reviewed by the City Attorney,with the contractual price being$3,361,000.00; and BE IT FURTHER RESOLVED that the City Administrator is hereby authorized to take such steps as necessary to complete this contractual arrangement to include the execution of the contract and any other related documents; and BE IT FURTHER RESOLVED that the total remaining project funds needed through completion of Station I (design work; material testing; construction; project support; furniture, fixtures and equipment; and contingency) is $3,800,000 and the funds for such project will come from the Sales Tax III Fund (3,525,975) and the Capital Projects Fund (274,025). DONE, RATIFIED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS a 15t DAY OF DECEMBER, 2020. A;( Robert A. Pettit,Mayor ATTEST: Sharon Lamar, City Clerk BID TABULATION JLA No. 3057.2003 PROJECT: North Augusta Public Safety Fire Station No. 1 Relocation BID OPENING DATE: November 17,2020 @ 2:00 PM LOCATION OF OPENING: North Augusta Municipal Center,100 Georgia Avenue, N.Augusta, SC,Is'Floor Meeting Room BID BOND ADOENDUM(S) CONTRACTOR'S NAME PROVIDED LUMP SUM BID AMOUNT ACKNOWLEDGED ALTERNATE DID COMMENTS SD Clifton Construction, Inc. Yes 3,361,000.00 1 &2 -60,000.00 • Sprallin&Son Construction Yes 3,690,000.00 1 &2 -50,000.00 R.D. Brown Contractors, Inc. Yes 3,740,000.00 1 &2 +68,000.00 RW Allen Construction,LLC. Yes 3,769,000.00 1 &2I, +81,000.00 McKnight Construction Company, Inc. Yes 4,149,000.00 1 &2 +81,500.00 • ENGINEERING CERTIFICATE To the t of my knowledge the enclosed bids are mathematically correct. Darren Prickett,PLA,ASLA JOHNSON.LASCHOBER&ASSOCIATES,PC CINDY M.HH L�A I - 3-to-2,3 Date Commission Expires CINDY M. HALL NOTARY PIIBUC MCDUFFIE COUNTY STATE OF GEORGIA My Co whims i Emm Me"10.2W