RES 2019-24 Adopted O b RESOLUTION NO. 2019-24 A RESOLUTION AUTHORIZING THE CITY OF NORTH AUGUSTA TO AWARD CONTRACT TO R.D. BROWN CONTRACTORS FOR THE RIVERSIDE VILLAGE AMPHITHEATER WHEREAS,the City of North Augusta allocated funds from Sales Tax 3 for the purpose of financing the cost of a new park development at Riverside Village; and WHEREAS, ON April 9, 2019, sealed bids were received from R.D. Brown Contractors and R.W. Allen Construction, publicly opened and read aloud for the PROJECT; and WHEREAS, the low bid by R.D. Brown is in the amount of$3,185,000; and WHEREAS, after negotiations through value engineering an offer of $1,972,535 will be presented to R.D. Brown; and WHEREAS,the Mayor and City Council of the City of North Augusta find that the awarding of such contract for the PROJECT is in the best interest of the City. BE IT FURTHER RESOLVED that the funding sources for this contract shall be as follows: Sales Tax 3 Series 2017B Bond Fund BE IT FURTHER RESOLVED that the City Administrator shall be authorized to enter into a contract with R.D. Brown Contractors in the amount of$1,972,535 to approve change orders, to make payments, and to sign all other documents relating thereof. DONE, RATIFIED,AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS lq+h DAY OF AUGUST, 2019. Robert A. Pettit, Mayor ATTEST: LO va&"-K) O}LtiYl4.a�f i Sharon Lamar, City Clerk Tabled 8-5-1 q Removed -Prom Tiblc E Approved 8-i9-i4 Alfred Bab e n e s e h 005B 6eneech&Company 1005 Street,Suite 200 Augusta,GA 90901 .. ATTACHMENT #2 p706-nz-6219 F 706-722-6119 Monday, April 15, 2019 North Augusta Amphitheater Park @ Riverside Village Post Bid Discussion&Analysis Discussion Items 1. Available budget 2. Review Comparative Tables using the cut &fill numbers from both contractors.This analysis quickly equalizes the bids. 3. Unit number comparison table for the unit price items. 4. Retaining wall deductive costs. 5. Electrical cost to meter($75,000) 6. Can the City self-perform any of the work? 7. Concerns with finish quality of work based on recently completed Greendacket stadium (same subcontractor) 8. Scope: See markup plan for options to date. File name RKipient Page 12 benesc BID ANALYSIS BID SUMMARY TABLE: R.D. Brown Contractors I jR.W. Allen Construction TOTAL BID 1$3,185,000.00 TOTAL BID $3,338,956.00 DIFFERENCE=$153,956(4.834%) CUT-FILL COST IMPACT ANALYSIS: R D BROWN R W ALLEN AREA DEPTH I VOLUME I DEPTH ADD TOTAL COST ADD TOTAL COST 40521 1 3002 1 FOOT $180,093.33 $3,365,093.33 $90,046.67 $3,429,002.67 40521 2 6003 2 FEET $360,186.67 $3,545,186.67 $180,093.33 $3,519,049.33 40521 5 15008 5 FEET $900,466.67 $4,085,466.67 $450,233.33 $3,789,189.33 40521 10 30016 10 FEET $1,800,933.33 $4,985,933.33 $900,466.67 $4,239,422.67 40521 15 45023 15 FEET $2,701,400.00 $5886,400.00 $1,350,700.00 $4,689,656.00 (Note: Cut and Fill computed for each figure as cut and fill are priced separately) ADDITIVE ITEMS COST ANALYSIS: BID# DESCRIPTION UNIT R D BROWN R W ALLEN ESTIMATE AA #57 STONE INSTALED TON $80.00 $50.00 $30.00 BB #4 STONE INSTALLED TON $80.00 $50.00 $35.00 CC NON-WOVEN GEOTEXTILE FABRIC INSTALLED (US 180NW) SY $8.00 $6.00 $4.00 DD WOVEN GEOTEXTILE FABRIC, INSTALLED(US 250) SY $8.00 $6.00 $4.00 EE GEOTEXBLE GEOGRID, INSTALLED Ge lid, Bas nd 11 SY $12.00 $10.00 $8.00 FF EXCAVATION&DISPOSAL OF UNSUITABLE MATERIALS CY $60.00 $30.00 $25.00 GG SELECTBACKFILLA1 INSTALLED CY $60.00 $35.00 $25.00 File name NORTH AUGUSTA AMPHITHEATER PARK @ RIVERSIDE VILLAGE BIO FORM R.D.Bro nContractors R.W.Allen Construction PAT REM DESCAMOVON UNIT GUANTR UNIT COST TOTAL UNIT COST TOTAL DEMOLNION a CLEARING COMPLETE LS 1 $29,229 D3 y9II600 $90626.00 S8G82 W 2 GRADING COMPLETE LS 1 5265.2 D3 II 34200 $127915000 $127,150.30 3 ELECTRICAL SERVICE TO METER LS 1 $15000.00 $75070 C0 $UAR..00 $124650.00 4 ELECTRICAL LIGHTING,COMPLETE LS 1 $230,]93.00 $2]0]9100 $204000.00 $203,00000 5 ELECTRICAL OTHER LS 1 $59010.14 f59,OtOCU $5430000 550]11000 6 M RIGATION,COMPLETE LS 1 $41.69.00 "I UD 00 $5950100 $5950100 T LANDSCAPING,COMPLETE L$ 1 $7],]1900 $1718. $178.474.00 1178474 00 6 TOMENS"K9"B',COMPLETE L$ 1 $23100900 $231,]00.00 !200,!63-00 $2.56300 9 GREENEWAV ENTRY FEATURES(4 EACH) LS 1 "502500 $46 D25 $22500.00 $2356800 10 IHANDSCAPE GREENEWAV TRAIL.COMPLETE LS 1 1 !120533.00 $12053300M$WM 2.00 $107,58200 11 XARDSCAPE ALL OTHER,COMPLETE LS 1 $700.603.00 "07003.00200 $350]4200 12 AMPHITXEATER.COMPLETE LS 1 $171$8700 $171287LU1500 $27561500 13 SPLASH PAD,COMPLETE LS 1 $2910100 $291,981007600 $27007500 W F FATURE FOUNTAINS,COMPLETE LS $27948900 $78,48900211/ 1269,529 C0 15 WATER UTILITY LS 1 $10218500 $102195.0025.00 $77425. 16 SHADE SHELTERS,COMPLETE(EACH) EA 0 "8,91000 5155840.. 9050 $145962.. 17 BTREET FURNITURE INSTALLATION LS 1 $1079700 $10,797. .DO STAN. 16 STORM DMINAGE COMPLETE LS 1 $201,814. $201014. 1000 $.7,410.70 19 RETAINING WALLS,COMPLETE LS 1 $1.,B.on $1UiS%U0ee 00 S1M,8.00 20 EROSION CONTROL,COMPLETE LS 1 $60,131. $80,1310075. $50,775.00 21 MOBILIZATION L$ 1 $192286.. $182288.00 "153!000 S`H A.CP 22 BONUS LS 1 $28408.. $254..00 $23,MeMe $23.3%.00 p SASE 610 15186,000.00 $],]$8,95800 XAL ITEMS NOT IDENTIFIED ON PLANS _.....NE NSTALEO TON WA 180.. $50.NE INSTALLED TON N/A EBO.W $5000 En luslmml 6V WA $900 $6.GEOTE%TILE FABRIC,INSTALLEO(US 2W) 6V WA $900 $6.UOTILE OEWRIO,INSTALLED(Gw9M,Sande 11) 6V NIA $ll00 $1000TION E 0ISPp30.OF UNSUITABLE MATERLLLS CV WA 58000 $3000 25 T SACN11U-A1 INSTALLED CV NIA $60.00 $3500 25 DEDUCTNE ALTERNATES -_- U1 DEDUCTNE ALTERNATE RI L$ 1 515 WD00 $1100000 $750000 $7500. PC DEDUCTIVE ALTERNATE M LS W OEOUCTIVE ALTERNATE e3 LS ADD ALTERNATE$ — ---Al ADD ALLEVIATE%I LS A2 ADD ALTERNATE 02 LS ADDENDA OAT. INITIALS INITIALS A01 ADDENDUM#1 A. DOENOUMQ AW ADDENDUM. AO5 ADDENDUM" ADS ADOEN OUM N5 AO6 JADDENDUM 46 A07 ADDENOUMM7 ADB NAUUhNUUM XB ADB ADDENDUM YB \ I " � fu r,z / g �__ ,R,• .. ""` IL`s �,a., i0benesch I d North Augusta Amphitheater Park at Riverside Village Honn niy i Parks,m � .� �. -r r. DEVELOPMENT PLAN TGRADING& I P P PWT-06�+ �gPSSd inti y dM.d� .� on, PCgS So- _JJll\P q ' -J34'S nd ALCC OSS U � d P-SAS r rou*smP- gna v r w A� I ` VE. GOAGW 3