Loading...
RES 2018-32 Adopted RESOLUTION NO. 2018-32 AUTHORIZATION OF FUNDING TO REPLACE THE CONVEYOR AT THE MATERIALS RECOVERY FACILITY AND ACCEPTANCE OF THE LOW BID FROM METALTECH SYSTEMS, INC. TO PERFORM SUCH SERVICES WHEREAS, a fire occurred at the Materials Recovery Facility on September 3rd 2018; and WHEREAS, the main solid waste conveyor system was structurally damaged as well as various walls and electrical components of the facility; and WHEREAS, the original conveyor system was installed in 1993; and WHEREAS, due to the age of the conveyor system and the damage from the fire it is in the best interest of the City to replace the conveyor system to avoid substantial reoccurring repair costs; and WHEREAS, the total estimated costs to repair the fire damage and replace the conveyor system is not to exceed$180,000; and WHEREAS, sealed bids were received and opened on December 3`d, 2018 for replacement of the conveyor system; and WHEREAS, the apparent low bidder is MetalTech Systems, Inc. with a bid of $145,704; and WHEREAS, insurance proceeds of$156,204.34 were received during 2018; and WHEREAS, additional funding of$23,795.66 is needed to complete the project. NOW THEREFORE, BE IT RESOLVED that the Mayor and City Council of the City of North Augusta, South Carolina, in meeting duly assembled and by the authority thereof, do hereby authorize total funding not to exceed $180,000 for fire damage repair of the Material Recovery Facility and replacement of the conveyor system with funding from insurance proceeds from the fire and the Sanitation Fund balance. DONE, RATIFIED AND ADOPTED BY THE MAYOR AND CITY COUNCIL O TY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS /7 DAY OF 2018. Robert A.Pettit, Mayor ATTEST: J� . Donna B. Young, ty Cler BIDDER AMOUNT METALTECH SYSTEMS, INC 145,704.00 ADVANCE INDUSTRIAL MAINTENANCE & 194,441.58 MACHINE HIGHTOWER WELDING NO BID—written response BATES INDUSTRIAL NO BID