Loading...
RES 2014-18 Adopted RESOLUTION NO. 2014-18 A RESOLUTION AUTHORIZING THE CITY OF NORTH AUGUSTA TO ACCEPT THE LOW BID OF BEAM'S CONTRACTING, INC. FOR THE GREENEWAY CULVERT REPLACEMENT WHEREAS, on or around June 1, 2014, a catastrophic sinkhole developed in the Greeneway due to a deteriorated culvert at a stream crossing; and WHEREAS, the City has proceeded with design of, and solicited bids for, the replacement of the culvert and repair of the Greeneway; and WHEREAS, two bids for the project were received by the City on the 11th day of September, 2014; and WHEREAS, each of the bids was publicly opened and read aloud and thereafter, all bids were reviewed by W.R. Toole Engineers, Inc., the engineering firm having designed the project and solicited the bids on behalf of the City; and WHEREAS, Toole Engineers has advised the City that the low bidder, Beam's Contracting, Inc. meets the requirements set forth in the information for bidders and recommends that the contract for the Greeneway Culvert Replacement be awarded to Beam's Contracting, Inc.; and WHEREAS, the low bid by Beam's Contracting, Inc. is in the amount of $975,885.08; and WHEREAS, the Mayor and City Council of the City of North Augusta find that the awarding of such bid is in the best interest of the City. NOW THEREFORE, BE IT RESOLVED that the Mayor and City Council of the City of North Augusta, South Carolina, in meeting duly assembled and by the authority thereof that Beam's Contracting, Inc. shall be awarded the contract for the Greeneway Culvert Replacement at a bid amount of$975,885.08. BE IT FURTHER RESOLVED that the funding source for this contract shall be the Stormwater Utility Fund. BE IT FURTHER RESOLVED that all unexpended funds presently encumbered in the Stormwater Utility Fund for "Land Acquisition" and "Drainage Projects," are hereby reallocated, to the extent needed, for the Greeneway Culvert Replacement, or other drainage projects. BE IT FURTHER RESOLVED that the City Administrator is authorized to execute any documents required for the entering into of this contract. ii RESOLUTION TO ACCEPT THE LOW BID OF BEAM'S CONTRACTING, INC. FOR THE GREENEWAY CULVERT REPLACEMENT Page 2 DONE, RATIFIED AND ADOPTED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF NORTH AUGUSTA, SOUTH CAROLINA, ON THIS (p*'� DAY OF OCTOBER,2014. •- • - • • - rl � Lark Jones, Mayor ATTEST: Donna B. Young, City Berk I ,I 1 1 1i I � 1 1 11 I 11